Question
What is an external approval, and who issues it?
The short answer
An external approval is a sign-off from a body other than the licensing authority, required for a specific activity. It comes from that activity's regulator. In the Ministry of Economy and Tourism's guidance, the municipality of the emirate covers engineering and architectural activities, the health authority covers health activities, and the Ministry of Interior covers alarm and protection systems. Depending on the activity, the approval falls before or after the licence issues, and our registers record which. The licensing authority decides that the company may exist and lists the activity. The external body decides whether you may perform it, so where an activity is marked as needing post-licence approval, holding the licence is not yet permission to start. Municipality, health authority, education regulator, transport, aviation, maritime, sports, media, security, environment, defence and the central bank all appear against activities in the registers we hold.
Before or After the Licence: How It Changes Your Plan
A pre-licence approval sits inside the formation timeline. For some activities the Ministry of Economy and Tourism says the relevant authority must approve before you even apply for initial approval, as with legal affairs and activities involving security entities or the Securities and Commodities Authority. You cannot get the licence until the body has signed off, so the approval is the critical path and the licence date moves with it.
A post-licence approval sits outside the formation timeline. The licence issues and the company exists, yet the activity cannot lawfully begin. People get caught because every visible milestone has been reached. The initial approval that precedes the licence is no safeguard either: the Ministry of Economy and Tourism states that it means the government has no objection to the entity, not that you may start the business.
Registers write this down explicitly. Entries appear marked before licence issuance, after licence issuance, or simply as post-licence approval required, and some registers carry an approval-stage field of their own.
The bodies that come up most in our registers
- Municipalities: food safety permits, consumer product permits, contractor registration and classification, engineering consultancy qualification and entry in a consultants and contractors register. In Dubai, food permits need an active licence covering the activity, and Dubai Municipality withdraws them without prior notice if the inspection grade drops or a critical food safety violation is found.
- Health authorities: health facility licensing, a separate regime from the trade licence that assesses premises and staff. The health authority of the emirate concerned decides it, not the licensing authority.
- Environment and climate authorities: environmental clearance graded by industrial category, from light through medium to major.
- Education regulators: for teaching, training and institutional activities.
- Transport, aviation and maritime authorities: for activities touching roads, air or sea operations. The Ministry of Interior approves public transportation services, driving centres and car rental.
- Media regulators: several media activities are recorded as requiring approval after the licence rather than before it.
- Security regulators: for guarding, systems and related services. The Ministry of Interior issues approvals for alarm and protection systems and fire extinguishing equipment.
- The Central Bank of the UAE: for activities that fall inside financial services.
- Defence and procurement bodies: for military goods trading.
What an approval is not
- Not a formality. The body applies its own criteria and can refuse.
- Not something the licensing authority can waive on your behalf.
- Not automatically portable between emirates, since several of these bodies are emirate-level.
- Not permanent: approvals have their own validity and renewal cycles, separate from the licence.
Where this stops
Related
Questions that come up next
Sources
Where this comes from
- Velarozone licence catalogue: external-approval bodies and approval stages recorded per activity in the parsed registers
- Central Bank of the UAE: Rulebook 3.3.2 on source of funds
- Each named regulator's own licensing directory
General information drawn from the CBUAE Rulebook, including the Retail Payment Services and Card Schemes Regulation (C 15/2021), and Cabinet Resolution No. (134) of 2025 as published, not legal or tax advice. Rules and guidance change, so confirm the current text and each institution's own requirements before you submit.
