How to Set Up a Carbon Capture, Utilisation or Storage Company in the UAE

Published

The short answer

The UAE has no single licence for carbon capture, utilisation and storage. In Abu Dhabi, the Supreme Council for Financial and Economic Affairs (SCFEA) grants geological storage concessions, and a Competent Authority named by the Executive Council issues the Transport System Operator's licence. Federally, the Ministry of Industry and Advanced Technology, the Ministry of Energy and Infrastructure and the Ministry of Climate Change and Environment each cover their own part. The deciding fact is which segment the company owns: capture equipment sits close to an industrial licence, while storage needs a concession that a commercial registration does not give.

Who decides which part of the chain

A CCUS business is really one of four businesses: a technology supplier, an industrial capture project, a transport and aggregation operator, or a utilisation or storage developer. In Abu Dhabi, the General Policy on Carbon Capture splits the chain the same way. A Supplier captures the carbon dioxide and answers for it from the point of emission to the delivery point. A Transport System Operator runs shared pipelines and hubs. A Storage Operator injects and monitors. A technology supplier licensing equipment into someone else's plant is closest to an ordinary industrial or trading licence. A company that owns the capture unit at an industrial site brings the Ministry of Industry and Advanced Technology's classification into scope. A company that owns the injection well or storage reservoir needs an SCFEA concession. The same question arises in a microgrid or distributed-energy company or a waste-to-energy project company, where the asset owner is not always the one who signs the customer contract.

What the regulators actually look at

Each authority's interest follows its own mandate, not a shared CCUS checklist. The Ministry of Industry and Advanced Technology classifies industrial facilities, so a capture unit bolted onto a cement, steel or petrochemical plant is assessed as part of that facility's industrial profile. The Ministry of Climate Change and Environment sets federal climate policy and is the natural reference point for how captured carbon dioxide is counted and claimed, which matters to a company planning to sell carbon credits. The Ministry of Energy and Infrastructure covers energy-sector policy federally. In Abu Dhabi, the General Policy on Carbon Capture (December 2025, endorsed by the SCFEA) sets the framework: the SCFEA grants storage concessions and approves the licensing regime, and the Competent Authority designated by the Executive Council reviews pipeline works and hub sites. Foreign entities may take part in capture activities, but work inside ADNOC concession areas needs prior written approval or a no-objection letter from ADNOC or the SCFEA, and importing carbon dioxide from outside the UAE for permanent storage needs SCFEA approval. Dubai Electricity and Water Authority governs connection to Dubai's power, water and gas networks, relevant if a capture plant draws feed gas or power from its grid. No body issues a single federal "CCUS licence", so a project outside Abu Dhabi's framework still assembles approvals from whichever body it touches.

What a bank or financier checks before funding

Lenders and investors read a CCUS proposal the way they read any industrial infrastructure deal: full-chain source, transport, destination and offtake certainty come before entity structure. Expect questions on performance and long-term risk allocation, the monitoring and verification plan, and who carries leakage or post-closure liability. In Abu Dhabi the policy keeps the Storage Operator liable for leakage until the post-injection monitoring period has expired and the reservoirs are sealed, so a lender will ask whether the project reaches that stage. A business plan and documentation set tying the technical case to the contracts carries more weight than a forecast alone. Investors will also be asked for source of wealth and funds evidence, and corporate bank account readiness, meaning clean ownership records, a coherent use-of-funds narrative and verifiable counterparties, shapes how quickly a bank onboards the company. Where a partner supplies capacity the company relies on, get written confirmation of that right rather than treating a conversation as secured capability.

Ownership, substance and the roles a CCUS project needs filled

Subsurface storage, pipeline transport and industrial capture tend to sit better in a project company with clear ownership of the physical asset than in a trading or advisory shell. Where the company carries long-term monitoring and handback liability, that ownership usually needs a regulated and complex ownership setup rather than a plain holding structure, because the entity holding the asset, the one signing the offtake contract and the one carrying post-closure liability can all be different parties. Converting captured carbon dioxide into a saleable product follows the same logic as a sustainable aviation fuel or biofuel company: the offtake contract, not the registration certificate, proves the pathway is real. Technical, health, safety and environmental roles need naming early, since a regulator assessing the facility asks who is accountable for each function, not just who owns the shares.

Where CCUS projects go wrong

  • Claiming permanent carbon dioxide abatement before the transport and storage chain is actually secured
  • Building capture capacity before a destination and offtake agreement exist
  • Selling the same environmental attribute or credit more than once
  • Leaving leakage and post-closure responsibility undefined once a project reaches handback
  • Treating a commercial licence as proof of industrial, environmental or energy-sector approval, when it is not

Words such as approved, certified, compliant or authorised need a named basis, a scope and a date behind them, particularly where storage integrity or credit claims reach customers. A company that gets this wrong usually did the formation step well and the operating step badly: the certificate was real, the chain behind it was not.

From licence to operating

A commercial licence is the start of the file, not the end of it. Premises for an industrial capture unit, control room or monitoring facility need to match the activity approved, and a change to the site, process or storage pathway should trigger a fresh look at the approvals in place, not a quiet continuation. Employment and sponsorship follow the operating plan rather than the licence category: technical, HSE and monitoring roles need naming before the first inspection. Cost here is built in layers (formation, approvals, the physical build, people and renewals) rather than one headline number; Velarozone's own fee is itemised separately in the engagement letter, and how Velarozone works sets out how those layers fit together.

Downtown Dubai skyline with the Burj Khalifa at golden hour

General guidance here; the detail that matters depends on your activity and markets.

Questions

Frequently asked

Does a carbon capture company need an environmental approval before it can operate?
The commercial licence does not stand in for one. The Ministry of Climate Change and Environment is the federal reference point for emissions and climate accounting, and an industrial capture facility is also assessed against the Ministry of Industry and Advanced Technology's industrial classification. Confirm the approval position for the facility before relying on the registration certificate alone.
Can a free-zone company own the pipeline or injection well?
Usually not for the shared parts. In Abu Dhabi, shared pipelines and intermediate storage at CCUS hubs are built and operated by the Transport System Operator, which the SCFEA designates with Government of Abu Dhabi ownership of not less than 51%, and geological storage is granted by SCFEA concession. A Supplier's own pipeline to the hub delivery point counts as part of its facilities unless otherwise agreed. A standard free-zone licence covers none of this, so confirm the structure before relying on it.
Who is responsible if stored carbon dioxide leaks after the project closes?
That depends on the contracts, permits and monitoring plan, not on the trade licence. In Abu Dhabi, the General Policy on Carbon Capture makes the Storage Operator responsible for direct liability from leakage within its facilities and for monitoring during and after injection. Liability passes to the Government of Abu Dhabi only when the concession period, including post-injection monitoring, expires, under the concession's terms. Elsewhere, assign leakage and post-closure liability in writing before storage begins, with a named party for monitoring and remediation.
Can a UAE company sell carbon credits generated by a capture project?
Only once the monitoring and verification position is settled and the credit has not already been claimed or sold elsewhere. The Ministry of Climate Change and Environment is the relevant reference point for how captured carbon dioxide is counted federally. In Abu Dhabi, the policy provides for a Carbon Capture/ Recovery/ Removal Certificate for carbon dioxide captured, utilised or stored in the emirate.
Does transporting captured carbon dioxide need a separate approval from running the capture plant?
Treat them as separate questions. Capture at an industrial site sits against the Ministry of Industry and Advanced Technology's classification. Transport and storage sit closer to energy-sector oversight, federally through the Ministry of Energy and Infrastructure. In Abu Dhabi, shared transport is licensed by the Competent Authority to the Transport System Operator, and storage is a separate SCFEA concession.

Get your UAE setup plan

Velarozone maps which part of the capture, transport, utilisation or storage chain the company owns, and which authorities that brings into scope, before any commercial licence is filed.

Apply this to your own situation

Guides describe the general position. Send us your facts and an adviser will tell you which parts actually apply to you.

Message us on WhatsApp

Free assessment: current figures are confirmed within your adviser-reviewed route comparison. Your details are not shared with third parties.

Start with a structure assessment

In an initial consultation you receive a plain-language decision summary, a document-preparation list, and the next actions for your situation. Current figures are confirmed within your adviser-reviewed route comparison.

This guide provides general information, not legal, regulatory, tax, investment, medical or financial advice. It does not guarantee a licence, authorisation, visa, bank account, funding, tax treatment or commercial outcome.

General information drawn from the CBUAE Rulebook, including the Retail Payment Services and Card Schemes Regulation (C 15/2021), and Cabinet Resolution No. (134) of 2025 as published, not legal or tax advice. Rules and guidance change, so confirm the current text and each institution's own requirements before you submit.